Topographic Survey
The complete picture — levels, features and boundaries in one drawing. The usual starting point.
Site Survey
A site survey records the land as it actually is — its shape, levels, boundaries and everything standing on it. It becomes the base drawing your architect, structural engineer and services consultant all work from.
What we offer
Most site surveys combine two or three of these. We will tell you which ones your project actually needs — and which it does not.
The complete picture — levels, features and boundaries in one drawing. The usual starting point.
Satellite positioning for open sites and long distances, tied to a known coordinate system.
Precise ground measurement where satellite signals are blocked by buildings or canopy.
Levels turned into contour lines, so slope and drainage can be read at a glance.
Structures, trees, poles, drains and compound walls located accurately.
A focused grid of spot levels where you need heights rather than a full feature survey.
Plot extent identified against your documents, for engineering purposes only.
We can locate your plot extent against documents you provide and mark it physically on the ground, which is what a design or construction team needs. That result carries no cadastral authority.
What we can do
What we cannot do
Legal boundary certification rests with the government revenue authorities and surveyors licensed under state law. Approach them for anything requiring legal standing.
Design decisions rest on assumptions about the ground. A site survey replaces those assumptions with measurements. It establishes where the plot boundaries run, how the land slopes, what is already built on it, where the trees and drains and poles are, and how the site relates to the road and to neighbouring properties.
The output is a drawing to scale, tied to a coordinate system, with levels referenced to a stated datum. Every later drawing — the site plan, the drainage layout, the earthwork calculation — is built on top of it.
A site survey should be the first technical activity on a project. In practice it becomes urgent at these moments:
Landowners and builders planning a development; architects who need a reliable base drawing; developers assessing a site before purchase; industrial clients expanding an existing facility; and consultants preparing designs for approval.
Which of these you receive depends on the services included:
How we work
Permanent reference points set and observed across the site. Everything measured later ties back to these.
Levels and features collected by total station, DGPS or both, depending on cover, size and accuracy needed.
Selected points re-observed from different control. If a check disagrees we re-measure, not adjust.
Observations reduced and adjusted, then drawn as layered CAD with coordinate system and datum stated.
Drawings, schedules and report issued — and we walk your design team through anything needing interpretation.
Questions
Before design begins. The site survey becomes the base drawing every later discipline works from. Commissioning it after design has started usually means reworking the design once the ground turns out different from what was assumed — which costs more than the survey would have.
No. Our boundary work is carried out for engineering and construction purposes only. We can identify the plot extent against documents you provide and mark it physically, but the result carries no legal authority. Legal demarcation and cadastral certification rest with the government revenue authorities and surveyors licensed under state law.
It varies widely. An open, level site with few features covers ground quickly. A wooded or built-up site with many features to pick up is far slower, because every tree, pole and drain has to be located individually. We give a realistic estimate after seeing the site or reviewing recent imagery of it.
Not for the whole survey, but it helps if someone who knows the site can meet the team at the start — to confirm access, point out the boundaries you believe apply, and flag anything that must be included. For boundary work in particular, having the owner or a representative present avoids ambiguity later.
We can use it as background information, and it often speeds up the work. But we will not certify someone else's measurements as current. If the old drawing has no stated datum or control record — which is common — it cannot be reliably tied to new work, and re-surveying is usually faster than reconciling the two.